Harnessed e-chain system ensures a fail-safe energy supply at the Memorial Bridge in New Hampshire

Profile

  • What was needed: Pre-assembled complete system for a reliable and safe energy supply
  • Requirements: Reduction of maintenance effort, reliable energy supply over a total distance of 40 m, fail-safe operation
  • Product: readychain® Pre-assembled energy chain
  • Area of application: Lifting bridge
  • Success for the customer: Thanks to the pre-assembled, ready-to-install readychain® systems and their installation, the customer saved assembly time and assembly work and received everything from igus® from a single source.

The challenge

Solution

readychain on Memorial Bridge

motion - magazine for energy chain systems®

Motion Magazine

Consulting

I look forward to answering your questions

Shipping and consultation