Change Language :
1,028 slats make up the sun protection façade of the E.ON technology centre. In order to minimise the workload after the installation of the huge exterior façade, the search was on for the most maintenance-free bearing technology possible at the pivot points of the vertical slats. Thanks to incorporated solid lubricants, they opted for iglidur® J bearings, which also enable optimum coefficient of friction without maintenance in the long term.
In person:
Monday to Friday from 7 am - 8 pm.
Saturdays from 8 am- 12 pm.
Online:
24h
WhatsApp-Service:
Montag – Freitag: 8 – 16 Uhr