Attach the side link, press together and snap into place.
Attach crossbar.
Press crossbar with screwdriver and lever in.
Dismantle the crossbar - apply the screwdriver and lever it open.
crossbar, clips, lid, bases on min. Dismantle 2 consecutive links, insert screwdriver into the groove of the side panel.
Then separate the chain links by levering them out.
Dismantle lid / base - apply screwdriver and lever open. Only loosen one side to swivel open!
Mounting the lid / floor Attach the energy tube at an angle and snap into place.
In person:
Monday to Friday from 7 am - 8 pm.Saturdays from 8 am- 12 pm.
Online:24h
WhatsApp-Service:Montag – Freitag: 8 – 16 Uhr