With our extensive global network of companies, we were able to meet these high demands. The regional branch worked closely with our engineering team. Together with the customer, we developed a customised solution. The objectives were clearly defined: The new system had to be low-maintenance and fail-safe, and it also had to have the longest possible service life. To realise this, heavy-duty roller energy chains from the 5050RHD series were used, including a heavy-duty stainless steel guide trough system. A floating moving end was installed to compensate for lateral tracking tolerances. The developed system works with large temperature fluctuations from 5 to 50 °C, weather fluctuations and high humidity. Greater system safety was realised so that nothing can fall from the crane. High-quality chainflex® TPE cables such as CF340, CF9, CF11 and CFLG were used to match the energy chain system.
In addition to the technical specifications and requirements, the installation service was realised according to the customer's strict deadlines. The complete system was replaced within 6 weeks. The installation itself took no longer than 10 days.
We were able to convince the customer with the solution across the board. The system represents a significant technical improvement and the professional installation service enabled us to meet our deadlines.