Lay the inner link together, attach the outer link at the side.
Mount crossbar - press with screwdriver and lever in.
Fit the clip - for semi-rigid energy chain - press and lever in.
Dismantle the crossbar - apply the screwdriver and lever it open.
Insert the screwdriver into the groove of the side panel and lever it out.
Remove the outer link to the side and separate the chain links.
Dismantle lid / floor.
Use a screwdriver and lever open.
Mount lid / shelves - attach at an angle and snap into place.
In person:
Monday to Friday from 7 am - 8 pm.Saturdays from 8 am- 12 pm.
Online:24h
WhatsApp-Service:Montag – Freitag: 8 – 16 Uhr