The cables for the pipe-laying and welding equipment were to be routed inside this pipe-laying vessel. The platform, which is guided on rails, covers longer distances and required a continuous and fluid movement, which is supported by the cable routing. Due to the trade show welding work, however, the primary focus was on the absolute safety of the internal cables, which had to be protected from flying hot swarf.