Offshore energy chain for strong cable guidance on a wind farm drilling rig

Profile

  • What was needed: Offshore energy chain OSC
  • Requirements: Safe cable routing from the ship to the drill was to be ensured in the event of high tensile forces, corrosive environments and long travel distances.
  • Industry: Offshore
  • Success for the customer: Thanks to the integrated tension cable in the two chain links, the energy chain ensures safe cable routing even when high forces are applied. The corrosive environment is no problem for the plastic chain, nor are the high levels of dirt, strong vibrations and impacts.
Offshore energy chain

Problem

Solution

Offshore energy chain
Offshore energy chain
OSC offshore chain
  • Two integrated pull ropes for double securing
  • Modular system
Find out more here

Consulting

I look forward to answering your questions

Shipping and consultation